On December 1, a batch of boxing fitness machines in the second workshop of intelligent equipment production and manufacturing of China Coal Group was being loaded in full swing. After the technical e
On November 5, due to the hot sale of the live broadcast room of China Coal Group, the message chair produced by the company again ushered in an intensive delivery period. After the technical engineer
On October 12, China Coal Group entered the intensive delivery period again. The production, quality inspection, warehouse, logistics and other departments worked together and worked overtime to assem
On September 16, a batch of robot waiters were loaded in the second workshop of intelligent equipment manufacturing. After the technical engineer verified the product name, specification, quantity and
On August 10, a batch of boxing fitness machines was loaded in the second workshop of intelligent equipment manufacturing. After the technical engineers verified the product name, specification, quant
On July 9, a batch of boxing fitness machines were loaded in the fourth and second workshops of China Coal Group's intelligent equipment production and manufacturing workshop, and will be sent to Fuyu
information
Product Category
information
©China Coal Manufacturing Group Co,. Ltd. © 2016
Address: No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor: Zhang Xing / Editor: Liu RuiRui